<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet media="screen" type="text/xsl" href="/wp-content/themes/smg/assets/xslt/rss-xslt.xml"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/"
xmlns:news="http://www.pugpig.com/news"
>

<channel>
	<title>David Sharp, The Associated Press, Author at Defense News</title>
	<atom:link href="https://www.defensenews.com/author/david-sharp/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.defensenews.com</link>
	<description>Covering the politics, business and technology of defense &#124; Defense News</description>
	<lastBuildDate>Thu, 20 Aug 2026 12:35:38 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://one.sightlinemg.com/wp-content/uploads/2026/06/favicon-def.png?w=32</url>
	<title>David Sharp, The Associated Press, Author at Defense News</title>
	<link>https://www.defensenews.com</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">255331545</site><atom:link rel="next" type="application/rss+xml" href="https://www.defensenews.com/author/david-sharp/feed/?paged=2" />
	<item>
		<title>Stealth destroyer to be home for 1st hypersonic weapon on a US warship</title>
		<link>https://www.defensenews.com/global/the-americas/2024/12/02/stealth-destroyer-to-be-home-for-1st-hypersonic-weapon-on-a-us-warship/</link>
					<comments>https://www.defensenews.com/global/the-americas/2024/12/02/stealth-destroyer-to-be-home-for-1st-hypersonic-weapon-on-a-us-warship/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Mon, 02 Dec 2024 19:00:00 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Global]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<category><![CDATA[The Americas]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2024/12/02/stealth-destroyer-to-be-home-for-1st-hypersonic-weapon-on-a-us-warship/</guid>

					<description><![CDATA[The U.S. is working to catch up with Russia and China in developing hypersonic weapons that travel beyond Mach 5.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/global/the-americas/2024/12/02/stealth-destroyer-to-be-home-for-1st-hypersonic-weapon-on-a-us-warship/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">70125</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/Navy_Warship_Hypersonics_40135.jpg.jpg" width="3936" height="2632" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/Navy_Warship_Hypersonics_40135.jpg.jpg" width="3936" height="2632" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">The U.S. Navy is transforming a costly flub into a potent weapon with the first shipborne hypersonic weapon, which is being retrofitted aboard the first of its three stealthy destroyers.</p>



<p class="wp-block-paragraph">The guided-missile destroyer Zumwalt is at a Mississippi shipyard where workers have installed missile tubes that replace twin turrets from a gun system that was never activated because it was too expensive. Once the system is complete, the Zumwalt will provide a platform for conducting fast, precision strikes from greater distances, adding to the usefulness of the warship.</p>



<p class="wp-block-paragraph">“It was a costly blunder. But the Navy could take victory from the jaws of defeat here, and get some utility out of them by making them into a hypersonic platform,” said Bryan Clark, a defense analyst at the Hudson Institute.</p>


	<aside class="smg-interstitial-link wp-block-smg-interstitial-link">
		<a href="https://www.militarytimes.com/news/your-navy/2023/08/31/uss-zumwalt-to-receive-hypersonic-missile-upgrades-at-hii/" class="smg-interstitial-link__inner">
							<div class="smg-interstitial-link__media">
					<img decoding="async" width="300" height="200" src="https://one.sightlinemg.com/wp-content/uploads/2026/08/Zumwalt.jpeg.jpg?w=300" class="smg-interstitial-link__image wp-post-image" alt="" />				</div>
						<div class="smg-interstitial-link__content">
				<span class="smg-interstitial-link__kicker">Related</span>
				<h3 class="smg-interstitial-link__title">USS Zumwalt to receive hypersonic missile upgrades at HII</h3>
									<p class="smg-interstitial-link__excerpt">The destroyer&#039;s modernization period includes installation of the Navy’s Conventional Prompt Strike hypersonic missile system.</p>
							</div>
		</a>
	</aside>
	


<p class="wp-block-paragraph">The U.S. has had several types of hypersonic weapons in development for the past two decades, but recent tests by both Russia and China <a href="https://sgp.fas.org/crs/weapons/R45811.pdf" target="_blank">have added pressure</a> to the U.S. military to hasten their production.</p>



<p class="wp-block-paragraph">Hypersonic weapons travel beyond Mach 5, five times the speed of sound, with added maneuverability making them harder to shoot down.</p>



<p class="wp-block-paragraph">Last year, The Washington Post reported that among the documents leaked by former Massachusetts Air National Guard member <a href="https://www.militarytimes.com/news/your-air-force/2024/11/12/pentagon-secrets-leaker-jack-teixeira-sentenced-to-15-years-in-prison/" target="_blank">Jack Teixeira</a> was a Defense Department briefing that confirmed China had recently tested an intermediate-range hypersonic weapon called the DF-27. While the Pentagon had previously acknowledged the weapon’s development, it had not recognized its testing.</p>



<p class="wp-block-paragraph">One of the U.S. programs in development and planned for the Zumwalt is the “Conventional Prompt Strike.” It would launch like a ballistic missile and then release a hypersonic glide vehicle that would travel at speeds seven to eight times faster than the speed of sound before hitting the target. The weapon system is being developed jointly by the Navy and Army. Each of the Zumwalt-class destroyers would be equipped with four missile tubes, each with three of the missiles for a total of 12 hypersonic weapons per ship.</p>



<p class="wp-block-paragraph">In choosing the Zumwalt, the Navy is attempting to add to the usefulness of a $7.5 billion warship that is considered by critics to be an expensive mistake despite serving as a test platform for multiple innovations.</p>



<p class="wp-block-paragraph">The Zumwalt was envisioned as providing land-attack capability with an Advanced Gun System with rocket-assisted projectiles to open the way for Marines to charge ashore. But the system featuring 155mm guns hidden in stealthy turrets was canceled because each of the rocket-assisted projectiles cost between $800,000 and $1 million.</p>



<p class="wp-block-paragraph">Despite the stain on its reputation, the three Zumwalt-class destroyers remain the Navy’s <a href="https://www.navytimes.com/naval/2021/03/25/what-should-become-of-the-zumwalt-class-the-us-navy-has-some-big-ideas/" target="_blank">most advanced surface warship in terms of new technologies</a>. Those innovations include electric propulsion, an angular shape to minimize radar signature, an unconventional wave-piercing hull, automated fire and damage control and a composite deckhouse that hides radar and other sensors.</p>


	<aside class="smg-interstitial-link wp-block-smg-interstitial-link">
		<a href="https://www.defensenews.com/pentagon/2024/11/18/pentagon-announces-hypersonic-testing-pact-with-uk-australia/" class="smg-interstitial-link__inner">
							<div class="smg-interstitial-link__media">
					<img decoding="async" width="300" height="169" src="https://one.sightlinemg.com/wp-content/uploads/2026/08/ARRW-test-on-B-52.jpg.jpg?w=300" class="smg-interstitial-link__image wp-post-image" alt="" />				</div>
						<div class="smg-interstitial-link__content">
				<span class="smg-interstitial-link__kicker">Related</span>
				<h3 class="smg-interstitial-link__title">Pentagon announces hypersonic testing pact with UK, Australia</h3>
									<p class="smg-interstitial-link__excerpt">The agreement, which falls under AUKUS Pillar II, aims to leverage the three nations’ combined hypersonics funding, facilities and experience.</p>
							</div>
		</a>
	</aside>
	


<p class="wp-block-paragraph">The Zumwalt <a href="https://www.militarytimes.com/news/your-navy/2023/08/31/uss-zumwalt-to-receive-hypersonic-missile-upgrades-at-hii/" target="_blank">arrived at the Huntington Ingalls Industries shipyard</a> in Pascagoula, Mississippi, in August 2023 and was removed from the water for the complex work of integrating the new weapon system. It is due to be undocked this week in preparation for the next round of tests and its return to the fleet, shipyard spokeswoman Kimberly Aguillard said</p>



<p class="wp-block-paragraph">A U.S. hypersonic weapon was successfully tested over the summer and development of the missiles is continuing. The Navy wants to begin testing the system aboard the Zumwalt in 2027 or 2028, according to the Navy.</p>



<p class="wp-block-paragraph">The U.S. weapon system will come at a steep price. It would cost nearly $18 billion to buy 300 of the weapons and maintain them over 20 years, according to the Congressional Budget Office.</p>



<p class="wp-block-paragraph">Critics say there is too little bang for the buck.</p>



<p class="wp-block-paragraph">“This particular missile costs more than a dozen tanks. All it gets you is a precise non-nuclear explosion, some place far, far away. Is it really worth the money? The answer is most of the time the missile costs much more than any target you can destroy with it,” said Loren Thompson, a longtime military analyst in Washington, D.C.</p>



<p class="wp-block-paragraph">But they provide the capability for Navy vessels to strike an enemy from a distance of thousands of kilometers — outside the range of most enemy weapons — and there is no effective defense against them, said retired Navy Rear Adm. Ray Spicer, CEO of the U.S. Naval Institute, an independent forum focusing on national security issues, and former commander of an aircraft carrier strike force.</p>



<p class="wp-block-paragraph">Conventional missiles that cost less aren’t much of a bargain if they are unable to reach their targets, Spicer said, adding the U.S. military really has no choice but to pursue them.</p>



<p class="wp-block-paragraph">“The adversary has them. We never want to be outdone,” he said.</p>



<p class="wp-block-paragraph">The U.S. is accelerating development because hypersonics have been identified as vital to U.S. national security with “survivable and lethal capabilities,” said James Weber, principal director for hypersonics in the Office of the Assistant Secretary of Defense for Critical Technologies.</p>



<p class="wp-block-paragraph">“Fielding new capabilities that are based on hypersonic technologies is a priority for the defense department to sustain and strengthen our integrated deterrence, and to build enduring advantages,” he said.</p>
]]></content:encoded>
	</item>
		<item>
		<title>Navy warship production in worst state in 25 years. What’s behind it?</title>
		<link>https://www.defensenews.com/naval/2024/08/11/navy-warship-production-in-worst-state-in-25-years-whats-behind-it/</link>
					<comments>https://www.defensenews.com/naval/2024/08/11/navy-warship-production-in-worst-state-in-25-years-whats-behind-it/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Sun, 11 Aug 2024 18:30:19 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2024/08/11/navy-warship-production-in-worst-state-in-25-years-whats-behind-it/</guid>

					<description><![CDATA[Labor shortages are one of many challenges that have led to backlogs in ship production at a time when the Navy faces expanding global threats.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/naval/2024/08/11/navy-warship-production-in-worst-state-in-25-years-whats-behind-it/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">50774</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP19173575936338.jpg.jpg" width="4000" height="3000" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP19173575936338.jpg.jpg" width="4000" height="3000" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">The <a href="https://www.navytimes.com/news/your-navy/2024/08/08/iranian-brothers-charged-in-smuggling-operation-tied-to-seals-deaths/" target="_blank">Navy’s</a> ability to build lower-cost warships that can <a href="https://www.navytimes.com/news/your-military/2024/02/12/all-the-houthi-us-navy-incidents-in-the-middle-east-that-we-know-of/" target="_blank">shoot down Houthi rebel missiles</a> in the Red Sea depends in part on a 25-year-old laborer who previously made parts for garbage trucks.</p>



<p class="wp-block-paragraph">Lucas Andreini, a welder at Fincantieri Marinette Marine, in Marinette, Wisconsin, is among thousands of young workers who’ve received employer-sponsored training nationwide as shipyards struggle to hire and retain employees.</p>



<p class="wp-block-paragraph">The labor shortage is one of myriad challenges that have led to backlogs in <a href="https://www.navytimes.com/news/your-navy/2023/02/24/navy-applies-lessons-from-costly-shipbuilding-mistakes/" target="_blank">ship production</a> and maintenance at a time when the Navy faces expanding global threats. Combined with shifting defense priorities, last-minute design changes and cost overruns, it has put the U.S. behind China in the number of ships at its disposal — and the gap is widening.</p>



<p class="wp-block-paragraph">Navy shipbuilding is currently in “a terrible state” — the worst in a quarter century, says Eric Labs, a longtime naval analyst at the Congressional Budget Office.</p>



<p class="wp-block-paragraph">“I feel alarmed,” he said. “I don’t see a fast, easy way to get out of this problem. It’s taken us a long time to get into it.”</p>



<p class="wp-block-paragraph">Marinette Marine is under contract to build six guided-missile frigates — the Navy’s newest surface warships — with options to build four more. But it only has enough workers to produce one frigate a year, according to Labs.</p>



<h2 class="wp-block-heading">Where have all the workers gone?</h2>



<p class="wp-block-paragraph">One of the industry’s chief problems is the struggle to hire and retain laborers for the challenging work of building new ships as graying veterans retire, taking decades of experience with them.</p>



<p class="wp-block-paragraph">Shipyards across the country have created training academies and partnered with technical colleges to provide workers with the skills they need to construct high-tech warships. Submarine builders and the Navy formed an alliance to promote manufacturing careers, and shipyards are offering perks to retain workers once they’re hired.</p>



<p class="wp-block-paragraph">Andreini trained for his job at Marinette through a program at Northeast Wisconsin Technical College. Prior to that, he spent several years as a production line welder, making components for garbage trucks. He said some of his buddies are held back by the stigma that shipbuilding is a “crappy work environment, and it’s unsafe.”</p>



<p class="wp-block-paragraph">But that’s not the reality, he said. His health benefits are better than at his previous job, he’ll be getting a pension for the first time, and there’s an opportunity to acquire skills even more advanced than what he received during his initial training.</p>



<p class="wp-block-paragraph">Plus, Andreini says, he feels like he’s serving his country.</p>



<p class="wp-block-paragraph">“It makes me happy to be able to do my part, and possibly make sure sailors and some of my friends in the service come home safely,” said Andreini, whose father was in the Navy in Vietnam.</p>



<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="3992" height="2992" src="/wp-content/uploads/2026/08/AP24198733068122.jpg.jpg" alt="" class="wp-image-112994"/><figcaption class="wp-element-caption">Ships under construction docked at Fincantieri Marinette Marine, July 12, 2024, Marinette, Wisconsin. (Mike Roemer/AP)</figcaption></figure>



<p class="wp-block-paragraph">Alonie Lake, also a welder, fellow graduate of the technical college’s program and a single mom, is happy for a job with long-term stability — something Marinette’s backlog of Navy contracts virtually guarantees.</p>



<p class="wp-block-paragraph">Lake, 32, said she thinks a lot of younger people are interested in jobs in the trades “and the satisfaction of working with their hands to create tangible results.”</p>



<p class="wp-block-paragraph">Navy Secretary Carlos Del Toro recently underscored the importance of training programs during commencement ceremonies at a community college in Maine. The college has partnered with nearby Portsmouth Naval Shipyard to teach workers the skills needed to repair nuclear submarines.</p>



<p class="wp-block-paragraph">“It is incumbent upon all of us to consider how we can best lend our talents and, in the case of the graduates, their newly developed skills, to build up our great nation for all Americans, and defend against the threats and challenges of today,” he said.</p>



<h2 class="wp-block-heading">Once workers are hired, will they stay?</h2>



<p class="wp-block-paragraph">The Navy is trying to help shipyards ensure that once new workers are trained and hired, they stick around in a tight labor market.</p>



<p class="wp-block-paragraph">In Wisconsin, part of $100 million in Navy funding that’s being provided to Marinette Marine is being used for retention bonuses at the shipyard, whose past employee retention was described by Del Toro as “atrocious.”</p>



<p class="wp-block-paragraph">The shipyard, which employs more than 2,000 workers, is providing bonuses of up to $10,000 to keep workers, said spokesperson Eric Dent. “The workforce shortage is definitely a problem and it’s a problem across the board for all shipyards,” he said.</p>



<p class="wp-block-paragraph">Retention is a concern even for shipyards that have met their goals, including Huntington Ingalls Industries, which makes destroyers and amphibious warships in Mississippi and aircraft carriers and submarines in Virginia.</p>



<p class="wp-block-paragraph">The company is creating training partnerships with colleges and public schools at all grade levels. Enhancements in Mississippi include more than a million square feet (92,900 square meters) of covered work area, cooldown and hydration stations, and a second dining area with a Chick-fil-A. Huntington Ingalls also collaborated with the Navy and the city of Newport News, Virginia, to build a new parking garage for workers and sailors.</p>



<figure class="wp-block-image size-large"><img decoding="async" src="/wp-content/uploads/2026/08/AP24198734292929.jpg.jpg" alt="" class="wp-image-112999"/><figcaption class="wp-element-caption">Workers leave Fincantieri Marinette Marine after their shift. (Mike Roemer/AP)</figcaption></figure>



<h2 class="wp-block-heading">A problem decades in the making</h2>



<p class="wp-block-paragraph">Much of the blame for U.S. shipbuilding’s current woes lies with the Navy, which frequently changes requirements, requests upgrades and tweaks designs after shipbuilders have begun construction.</p>



<p class="wp-block-paragraph">That’s seen in cost overruns, technological challenges and delays in the Navy’s newest aircraft carrier, the USS Ford; the spiking of a gun system for a stealth destroyer program after its rocket-assisted projectiles became too costly; and the early retirement of some of the Navy’s lightly armored littoral combat ships, which were prone to breaking down.</p>



<p class="wp-block-paragraph">The Navy vowed to learn from those past lessons with the new frigates they are building at Marinette Marine. The frigates are prized because they’re less costly to produce than larger destroyers but have similar weapon systems.</p>



<p class="wp-block-paragraph">The Navy chose a ship design already in use by navies in France and Italy instead of starting from scratch. The idea was that 15% of the vessel would be updated to meet U.S. Navy specifications, while 85% would remain unchanged, reducing costs and speeding construction.</p>



<p class="wp-block-paragraph">Instead, the opposite happened: The Navy redesigned 85% of the ship, resulting in cost increases and construction delays, said Bryan Clark, an analyst at the Washington-based think tank Hudson Institute. Construction of the first-in-class Constellation warship, which began in August 2022, is now three years behind schedule, with delivery pushed back to 2029.</p>



<p class="wp-block-paragraph">The final design still isn’t completed.</p>



<h2 class="wp-block-heading">Shifting threats and changing plans</h2>



<p class="wp-block-paragraph">Complicating matters further is something out of the Navy’s control: the changing nature of global threats.</p>



<p class="wp-block-paragraph">Throughout its history, the Navy has had to adapt to varying perils, whether it be the Cold War of past decades or current threats including war in the Middle East, growing competition from Chinese and Russian navies, piracy off the coast of Somalia and persistent attacks on commercial ships by Houthi rebels in Yemen.</p>



<p class="wp-block-paragraph">And that’s not all. The consolidation of shipyards and funding uncertainties have disrupted the cadence of ship construction and stymied long-term investments and planning, says Matthew Paxton of the Shipbuilders Council of America, a national trade association.</p>



<p class="wp-block-paragraph">“We’ve been dealing with inconsistent shipbuilding plans for years,” Paxton said. “When we finally start ramping up, the Navy is shocked that we lost members of our workforce.”</p>



<p class="wp-block-paragraph">The Navy insists it’s taking the shipbuilding problems seriously.</p>



<p class="wp-block-paragraph">“The Navy’s role in defending our nation and promoting peace has never been more expansive or mattered more,” said Lt. Kyle Hanton, a spokesperson for Del Toro’s office. “We continue to work with our industry partners to identify creative solutions to solving our common challenges.”</p>
]]></content:encoded>
	</item>
		<item>
		<title>Navy applies lessons from costly shipbuilding mistakes</title>
		<link>https://www.defensenews.com/naval/2023/02/24/navy-applies-lessons-from-costly-shipbuilding-mistakes/</link>
					<comments>https://www.defensenews.com/naval/2023/02/24/navy-applies-lessons-from-costly-shipbuilding-mistakes/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Fri, 24 Feb 2023 23:32:02 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2023/02/24/navy-applies-lessons-from-costly-shipbuilding-mistakes/</guid>

					<description><![CDATA[Navy officials say they’re slowing down the design and purchase of the next-generation destroyer, dubbed DDG(X), to ensure new technology has matured.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/naval/2023/02/24/navy-applies-lessons-from-costly-shipbuilding-mistakes/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">38066</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/Bath2.jpg_44a757.jpg" width="4932" height="3282" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/Bath2.jpg_44a757.jpg" width="4932" height="3282" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — The U.S. Navy appears to have learned from <a href="https://www.defensenews.com/digital-show-dailies/surface-navy-association/2021/01/11/heres-the-us-navys-plan-to-stop-its-string-of-shipbuilding-failures/" target="_blank">its costly lessons</a> — after cramming too much new technology onto warships and speeding them into production — as it embarks on building new destroyers that are the backbone of the fleet.</p>



<p class="wp-block-paragraph">Military officials say they’re slowing down the design and purchase of its next-generation destroyers, <a href="https://www.defensenews.com/naval/2021/06/04/navy-creates-ddgx-program-office-after-years-of-delays-for-large-combatant-replacement/" target="_blank">dubbed DDG(X)</a>, to ensure new technology like powerful lasers and hypersonic missiles are mature before pressing ahead on construction.</p>


	<aside class="smg-interstitial-link wp-block-smg-interstitial-link">
		<a href="https://www.defensenews.com/naval/2022/12/12/us-navy-secretary-sees-no-need-to-rush-next-gen-destroyer-program/" class="smg-interstitial-link__inner">
							<div class="smg-interstitial-link__media">
					<img loading="lazy" decoding="async" width="300" height="200" src="https://one.sightlinemg.com/wp-content/uploads/2026/08/DDG123_SeaTrials01_RH_10-06-22.jpg.jpg?w=300" class="smg-interstitial-link__image wp-post-image" alt="" />				</div>
						<div class="smg-interstitial-link__content">
				<span class="smg-interstitial-link__kicker">Related</span>
				<h3 class="smg-interstitial-link__title">US Navy secretary sees no need to rush next-gen destroyer program</h3>
									<p class="smg-interstitial-link__excerpt">The industrial base is behind on destroyer deliveries, but SECNAV wants to continue the line &quot;for a long period of time&quot; instead of rushing to start DDG(X)</p>
							</div>
		</a>
	</aside>
	


<p class="wp-block-paragraph">The Navy has learned “sometimes the hard way, when we <a href="https://www.defensenews.com/naval/2022/08/18/surface-navy-looks-for-ways-to-more-quickly-field-ships-weapons/" target="_blank">move too fast</a> we make big mistakes,” said Adm. Michael Gilday, chief of naval operations.</p>



<p class="wp-block-paragraph">“Let’s be deliberate. Let’s not have our eyes become bigger than our stomach and get too far ahead of ourselves,” Gilday said last week at an event for defense industry officials in San Diego.</p>



<p class="wp-block-paragraph">The Navy wants to turn the page on recent shipbuilding blunders.</p>



<p class="wp-block-paragraph">Several newer combat ships designed for speed <a href="https://www.navytimes.com/news/your-navy/2022/09/14/lcs-coronado-decommissioned-after-less-than-9-years-of-active-service/" target="_blank">are being retired early</a> after being beset by problems. The $13.3 billion aircraft carrier Ford experienced added costs from new catapults that launch airplanes. Workers completed construction of <a href="https://www.defensenews.com/naval/2018/04/19/advanced-gun-system-was-holding-back-the-navys-new-stealth-destroyer/" target="_blank">a stealth destroyer</a> before its advanced gun system, already installed, was scrapped.</p>



<p class="wp-block-paragraph">For the new ship, the Navy is reducing risk by conducting more land tests and borrowing the radar and targeting system from the latest destroyers that’ll soon join the fleet, said Lt. Cmdr. Javan Rasnake, spokesman for the assistant secretary of the Navy for research, development and acquisition.</p>



<p class="wp-block-paragraph">It’s also working with shipbuilders and designers to refine the ship’s blueprint, cost estimates, and workforce and supply forecasts, Rasnake said.</p>



<p class="wp-block-paragraph">The Navy still plans to field some new technologies on the destroyer.</p>



<figure class="wp-block-image size-large"><img decoding="async" src="/wp-content/uploads/2026/08/Bath1.jpg.jpg" alt="" class="wp-image-81403"/><figcaption class="wp-element-caption">Welder Neal Larsen works on the hull of a Zumwalt-class destroyer Aug. 29, 2018, at Bath Iron Works in Bath, Maine. (Robert F. Bukaty/AP)</figcaption></figure>



<p class="wp-block-paragraph">Last week, it awarded Lockheed Martin a $1.2 billion <a href="https://www.defensenews.com/naval/2023/02/22/navys-hypersonic-launcher-is-headed-to-flight-testing-next-year/" target="_blank">contract for hypersonic missiles</a> that travel at five times the speed of sound, and can be fired from destroyers. Last summer, it awarded the first design contract for the new ship outfitted with those missiles and lasers powerful enough to shoot down aircraft.</p>



<p class="wp-block-paragraph">Matt Caris, a defense analyst with Avascent, said it’s important that the Navy gets it right by balancing the best technology that’s reliable, affordable and attainable.</p>



<p class="wp-block-paragraph">“The Navy is trying to thread the needle with some potentially revolutionary capabilities in as low risk and evolutionary process as possible. This was a lesson learned by the Navy’s laundry list of shameful acquisition programs,” he said.</p>



<p class="wp-block-paragraph">Some worry about history repeating itself.</p>



<p class="wp-block-paragraph">There are new Navy leaders overseeing many programs and “it’s easy to imagine them making similar mistakes again with a new cast of characters,” said Loren Thompson of the Lexington Institute, a security think tank.</p>



<p class="wp-block-paragraph">The Navy is in the midst of juggling its priorities as it seeks not just a new destroyer but also a new attack submarine and a <a href="https://www.navytimes.com/news/your-air-force/2022/12/23/pentagon-lacks-big-picture-for-fighter-jet-procurement-watchdog-says/" target="_blank">replacement for the F/A-18 Super Hornet</a> fighter jet.</p>



<p class="wp-block-paragraph">The Navy is in a difficult spot because the Biden administration is not interested in dramatically increasing the military budget, said Bryan Clark, a defense analyst at the Hudson Institute. Research and development alone would cost an extra $10 billion to $20 billion for the destroyer, submarine and jet, he said, representing a big chunk of the $220 billion Navy budget.</p>



<p class="wp-block-paragraph">The speedy, coast-hugging literal combat ships embodied shipbuilding mistakes that the Navy is trying to avoid. Critics said early versions were too lightly armored to survive combat. One version of the LCS had propulsion problems. Some of the ships broke down and had to be towed. Plans for a submarine detection system were scrapped.</p>



<figure class="wp-block-image size-large"><img decoding="async" src="/wp-content/uploads/2026/08/Bath3.jpg.jpg" alt="" class="wp-image-81405"/><figcaption class="wp-element-caption">Spectators watch the Zumwalt-class destroyer Lyndon B. Johnson travel down the Kennebec River on its way to sea Jan. 12, 2022, in Phippsburg, Maine. The Navy is taking steps to ensure new technology, like lasers and hypersonic missiles, has matured before putting it on ships. (Robert F. Bukaty/AP)</figcaption></figure>



<p class="wp-block-paragraph">Combined, the costs of the stealthy Zumwalt destroyer and Ford-class aircraft carrier grew by $6.8 billion in today’s dollars, according to the Congressional Budget Office.</p>



<p class="wp-block-paragraph">“They’ve digested that lesson,” Clark said. “Part of what you’re seeing is a recognition that the underlying technologies are not ready yet. They don’t want to drive the program where the ship starts production before the technology is ready.”</p>



<p class="wp-block-paragraph">Gilday, who is the Navy’s top officer, said the transition to the new destroyers will likely start in the “2032 time frame.” For now, top Navy leadership want to keep current production lines of destroyers humming until designs are ready.</p>



<p class="wp-block-paragraph">That means shipyards in Maine and Mississippi will continue making existing Arleigh Burke-class destroyers. They hold the Navy’s record for longest production run for large surface warships.</p>



<p class="wp-block-paragraph">At Maine’s Bath Iron Works, where the first Arleigh Burke was built in 1998, shipbuilders are happy to continue building the existing ships while new designs are tested.</p>



<p class="wp-block-paragraph">Charles Krugh, shipyard president, said shipbuilders prefer the approach of taking extra time to make sure the technology and design are right.</p>



<p class="wp-block-paragraph">“If we get a fully designed ship, it’s obviously going to make us a whole lot more productive and efficient,” he said.</p>
]]></content:encoded>
	</item>
		<item>
		<title>Army veteran tasked with getting Navy shipbuilder back in shape</title>
		<link>https://www.defensenews.com/industry/2022/12/28/army-veteran-tasked-with-getting-navy-shipbuilder-back-in-shape/</link>
					<comments>https://www.defensenews.com/industry/2022/12/28/army-veteran-tasked-with-getting-navy-shipbuilder-back-in-shape/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Wed, 28 Dec 2022 02:42:15 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Digital Show Dailies]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<category><![CDATA[Surface Navy]]></category>
		<category><![CDATA[veterans]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2022/12/28/army-veteran-tasked-with-getting-navy-shipbuilder-back-in-shape/</guid>

					<description><![CDATA[Army veteran Charles F. Krugh, president of Bath Iron Works, took over the Maine shipyard seven months ago.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/2022/12/28/army-veteran-tasked-with-getting-navy-shipbuilder-back-in-shape/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">47603</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP22355662378899.jpg.jpg" width="3194" height="2129" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP22355662378899.jpg.jpg" width="3194" height="2129" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — Making the switch from building corporate jets to building Navy warships has been reinvigorating for a soldier-turned-business executive who’s leading Navy shipbuilder Bath Iron Works.</p>



<p class="wp-block-paragraph">Charles “Chuck” Krugh said he wasted no time in getting his hands dirty, meeting daily with workers on the ships’ “deck plates.”</p>



<p class="wp-block-paragraph">“I’m a hands-on guy that likes to get into the details,” he said.</p>



<p class="wp-block-paragraph">Shipbuilders weren’t so sure at first whether it was just an act, but after six months they’re now accustomed to him regularly chatting with shipbuilders to get a handle on their workflow, at all hours of the day and night.</p>



<p class="wp-block-paragraph">Labor relations have improved along the way.</p>



<p class="wp-block-paragraph">“It’s all been good. We’re moving in the right direction. We’ve just got to keep moving that way,” said Rock Grenier, president of Local S6 of the Machinists Union, which represents production workers.</p>



<figure class="wp-block-image size-large"><img decoding="async" src="/wp-content/uploads/2026/08/AP22355662377694.jpg.jpg" alt="Charles F. Krugh, president of Bath Iron Works, listens during a meeting at his office at the shipyard, Tuesday, Dec. 20, 2022, in Bath, Maine." class="wp-image-107212"/><figcaption class="wp-element-caption">Charles F. Krugh, president of Bath Iron Works, listens during a meeting at his office at the shipyard, Tuesday, Dec. 20, 2022, in Bath, Maine. (Robert F. Bukaty/AP)</figcaption></figure>



<p class="wp-block-paragraph"><a href="https://www.defensenews.com/naval/2022/05/05/general-dynamics-names-new-bath-iron-works-president/" target="_blank">Krugh, 58,</a> arrived in June after the <a href="https://www.defensenews.com/industry/2022/04/08/bath-iron-works-boss-abruptly-resigns/" target="_blank">abrupt departure</a> of former Bath Iron Works President Dirk Lesko, who led the General Dynamics subsidiary through a difficult period that included a pandemic and a two-month strike, both of which lengthened construction delays.</p>



<p class="wp-block-paragraph">The future guided-missile destroyer <a href="https://www.militarytimes.com/news/2021/10/03/destroyer-named-for-sen-carl-levin-christened-in-maine/" target="_blank">USS Carl M. Levin</a> that completed acceptance trials this month is more than a year behind schedule. The silver lining, Krugh said, is that the warship earned the highest marks for a Bath-built ship in years in a review by the Navy’s Board of Inspection and Survey.</p>



<p class="wp-block-paragraph">Krugh said he’s encouraging the shipyard’s 7,000 workers to rethink processes to ensure they can complete tasks as efficiently as possible. A big part of that is ensuring proper planning before a task even starts.</p>



<p class="wp-block-paragraph">“We show people that you can do the impossible, or the seemingly impossible, if you spend enough preparation time to get things ready. So that’s the good news side of what we’re doing, and we’re seeing a momentum building now,” he said.</p>



<p class="wp-block-paragraph">The Army veteran formerly served at Gulfstream, another General Dynamics subsidiary, which builds business jets, before being tasked with overseeing a historic shipyard that dates to the late 1800s.</p>



<p class="wp-block-paragraph">He said he was taken aback by labor relations and the condition of the company upon his arrival.</p>



<p class="wp-block-paragraph">Part of the improvement in relations with the union and in shipbuilding efficiency was the rehiring of shipyard veteran, David Clark, from Marinette Marine, to serve as vice president of manufacturing, Grenier said.</p>



<p class="wp-block-paragraph">“We’re doing everything we can to keep building those ships faster and more efficient,” the union president said.</p>



<p class="wp-block-paragraph">The shipyard is continuing to hire hundreds of new workers to replace older workers who are retiring, and Krugh said they’ll picking up the necessary skills to build the latest versions of the Arleigh Burke-class destroyer along with the next-generation destroyer in coming years.</p>



<p class="wp-block-paragraph">Continual improvement made possible by cooperation is necessary to assure the shipyard’s survival, said Loren Thompson, a defense analyst at the Lexington Institute.</p>



<p class="wp-block-paragraph">The future isn’t assured for the shipyard beyond the current decade unless the shipyard continues to become more competitive, Thompson said. Bath Iron Works competes with the larger Ingalls Shipbuilding in Mississippi for contracts to build destroyers, the workhorse of the Navy.</p>



<p class="wp-block-paragraph">“It is imperative for the union and management to get along because if they don’t, the long-term consequences for the yard could be fatal,” he said.</p>



<p class="wp-block-paragraph">As for Krugh, he said some outsiders mistakenly suggested he’d struggle with the transition from aerospace to shipbuilding.</p>



<p class="wp-block-paragraph">But he said he’s rejuvenated by being closer to the military — and urged any critics to watch and see what happens at the shipyard before casting judgment on the shipyard’s abilities.</p>



<p class="wp-block-paragraph">“This is really personal for me. This is our country. We don’t build mixers here. We’re building the warships that are going to protect my family, your family and other Americans,” he said.</p>
]]></content:encoded>
	</item>
		<item>
		<title>US Navy ditches futuristic railgun, eyes hypersonic missiles</title>
		<link>https://www.defensenews.com/industry/techwatch/2021/07/01/us-navy-ditches-futuristic-railgun-eyes-hypersonic-missiles/</link>
					<comments>https://www.defensenews.com/industry/techwatch/2021/07/01/us-navy-ditches-futuristic-railgun-eyes-hypersonic-missiles/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Thu, 01 Jul 2021 15:10:32 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[MilTech]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2021/07/01/us-navy-ditches-futuristic-railgun-eyes-hypersonic-missiles/</guid>

					<description><![CDATA[The U.S. Navy has pulled the plug, for now, on a futuristic weapon that fires projectiles at up to seven times the speed of sound using electricity.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/techwatch/2021/07/01/us-navy-ditches-futuristic-railgun-eyes-hypersonic-missiles/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">36871</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/main.jpg_9d4fa3.jpg" width="3894" height="2604" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/main.jpg_9d4fa3.jpg" width="3894" height="2604" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[<figure class="wp-block-smg-jwplayer-video"><atype-video-jwplayer nostick="true" playlisturl="https://cdn.jwplayer.com/v2/playlists/fCzRqMW8?tags=0905b93b-f0a4-46d4-b243-e941fa455d0f" aspectratio="16 / 9" mute autostart="false"></atype-video-jwplayer><figcaption class="wp-element-caption">In July 2017, the Office of Naval Research announced that the Navy&#8217;s electromagnetic railgun is ready for field demonstrations.</figcaption></figure>


<p class="wp-block-paragraph">BATH, Maine — The U.S. Navy has pulled the plug, for now, on a <a href="https://www.defensenews.com/naval/2016/06/26/us-navy-keeps-electromagnetic-cannon-in-its-sights/" target="_blank">futuristic weapon</a> that fires projectiles at up to seven times the speed of sound using electricity.</p>



<p class="wp-block-paragraph">The Navy spent more than a decade developing the electromagnetic railgun and once considered putting them on the new, stealthy Zumwalt-class destroyers built at Maine’s Bath Iron Works.</p>



<p class="wp-block-paragraph">But the Defense Department is turning its attention to hypersonic missiles to <a href="https://www.defensenews.com/global/asia-pacific/2018/02/01/photos-suggest-china-is-prepping-to-test-a-electromagnetic-railgun-at-sea/" target="_blank">keep up with China</a> and Russia, and the Navy cut funding for railgun research from its <a href="https://www.defensenews.com/congress/budget/2021/05/28/us-navy-fy22-budget-request-prioritizes-readiness-recovery-over-procurement-buys-4-warships/" target="_blank">latest budget proposal</a>.</p>



<p class="wp-block-paragraph">“The railgun is, for the moment, dead,” said Matthew Caris, a defense analyst at consultancy Avascent Group.</p>



<p class="wp-block-paragraph">The removal of funding suggests the Navy saw both challenges in implementing the technology as well as shortcomings in the projectiles’ range compared to hypersonic missiles, he said.</p>



<p class="wp-block-paragraph">The Navy’s decision to pause research at year’s end frees up resources for hypersonic missiles, directed-energy systems (like lasers) and electronic warfare systems, said Lt. Courtney Callaghan, a Navy spokesperson. Information gleaned during testing will be retained in the event the Office of Naval Research wants to pick up where it left off in the future, she added.</p>



<p class="wp-block-paragraph">All told, the Navy spent about $500 million on research and development, according to Bryan Clark, an analyst at the Hudson Institute.</p>



<p class="wp-block-paragraph">The technology was close to making the leap from science fiction to reality in the 21st century with the testing of prototypes. The concept held the possibility of providing an effective weapon at pennies on the dollars compared to smart bombs and missiles. That’s because railguns use electricity instead of gunpowder, or jet or rocket engines, to accelerate a projectile at six or seven times the speed of sound. That creates enough kinetic energy to destroy targets.</p>



<figure class="wp-block-image size-large"><img decoding="async" src="/wp-content/uploads/2026/08/secondary.jpg.jpg" alt="" class="wp-image-78142"/><figcaption class="wp-element-caption">A high-speed camera captures a full-energy shot by an electromagnetic railgun prototype launcher at a test facility in Dahlgren, Va. (John F. Williams/U.S. Navy via AP)</figcaption></figure>



<p class="wp-block-paragraph">But there were a number of problems. Those included the range of about 110 miles in testing. A Navy vessel could not employ the gun without putting itself within range of a barrage of enemy missiles. And its usefulness for missile defense was also limited by range and rate of fire, Clark said.</p>



<p class="wp-block-paragraph">The idea dates back to the 1940s. But there have always been major hurdles because the parallel rails, or conductors, are subjected to massive electric current and magnetic forces that can cause damage after a few shots, said defense analyst Norman Friedman. A big question was always whether the gun could stay together during continuous firing, Friedman added.</p>



<p class="wp-block-paragraph">A normal gun can be fired about 600 times before the barrel must be refurbished, but the barrel on the railgun prototype had to be replaced after about a dozen or two dozen shots were fired, Clark said.</p>



<p class="wp-block-paragraph">A few years ago, the Navy was talking about putting the gun on the future warship Lyndon B. Johnson, the last of three stealthy destroyers. It’s nearing completion and builder trials at Bath Iron Works.</p>



<p class="wp-block-paragraph">The 600-foot-long warship uses marine turbines similar to those that propel the Boeing 777 aircraft to help produce up to 78 megawatts of electricity for use in propulsion, weapons and sensors. That’s more than enough electricity for the railgun, and the ship has space following the cancellation of the advanced gun system, leaving the ship with no conventional cannon-based weapon.</p>



<p class="wp-block-paragraph">Instead, the Navy is pursuing an offshoot of the railgun, a hypervelocity projectile, that can be fired from existing gun systems.</p>
]]></content:encoded>
	</item>
		<item>
		<title>US Navy’s top officer applauds workforce at Bath Iron Works</title>
		<link>https://www.defensenews.com/industry/2021/05/11/us-navys-top-officer-applauds-workforce-at-bath-iron-works/</link>
					<comments>https://www.defensenews.com/industry/2021/05/11/us-navys-top-officer-applauds-workforce-at-bath-iron-works/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Tue, 11 May 2021 20:58:02 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2021/05/11/us-navys-top-officer-applauds-workforce-at-bath-iron-works/</guid>

					<description><![CDATA[The shipyard builds destroyers, the workhorse of the Navy fleet.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/2021/05/11/us-navys-top-officer-applauds-workforce-at-bath-iron-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19826</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/6638586.jpg.jpg" width="1200" height="675" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/6638586.jpg.jpg" width="1200" height="675" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — The U.S. Navy’s top officer liked what he saw Monday during a tour of shipbuilder Bath Iron Works, praising the shipyard and its workforce for getting back on track <a href="https://www.navytimes.com/news/your-navy/2020/08/23/shipbuilders-approve-3-year-pact-ending-monthslong-strike-at-bath-iron-works/" target="_blank">after a strike last summer</a>.</p>



<p class="wp-block-paragraph"><a href="https://www.navytimes.com/news/your-navy/2019/08/06/inside-the-historic-decision-to-deep-select-the-navys-top-officer/" target="_blank">Adm. Mike Gilday</a>, chief of naval operations, applauded the patriotism he saw in the workforce and described the shipyard founded in 1884 as a “national treasure” after touring ships under construction, and speaking to shipbuilders and shipyard leaders.</p>



<p class="wp-block-paragraph">Ramping up construction of destroyers is important as the U.S. Navy faces growing competition from China and Russia. </p>



<p class="wp-block-paragraph">“Bath is on a path here to begin delivering two ships by the end of the year. That’s a strong trajectory for Bath Iron Works. And it’s not without a lot of hard work during a pandemic to get to that point,” he said.</p>



<p class="wp-block-paragraph">The General Dynamics subsidiary was more than six months behind schedule  before a two-month strike by production workers last summer. The delays were serious enough to knock the shipyard out of contention for a lucrative contract to build a new class of frigates, officials said.</p>


	<aside class="smg-interstitial-link wp-block-smg-interstitial-link">
		<a href="https://www.navytimes.com/news/your-navy/2020/08/23/shipbuilders-approve-3-year-pact-ending-monthslong-strike-at-bath-iron-works/" class="smg-interstitial-link__inner">
							<div class="smg-interstitial-link__media">
					<img loading="lazy" decoding="async" width="300" height="200" src="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP20236528109522.jpg.jpg?w=300" class="smg-interstitial-link__image wp-post-image" alt="" />				</div>
						<div class="smg-interstitial-link__content">
				<span class="smg-interstitial-link__kicker">Related</span>
				<h3 class="smg-interstitial-link__title">Shipbuilders approve 3-year pact, ending monthslong strike at Bath Iron Works</h3>
									<p class="smg-interstitial-link__excerpt">A 63-day strike at Bath Iron Works — against the backdrop of a pandemic in an election year — came to an end Sunday with shipbuilders voting to return to their jobs producing warships for the United States Navy.</p>
							</div>
		</a>
	</aside>
	


<p class="wp-block-paragraph">Republican U.S. Sen. Susan Collins and independent U.S. Sen. Angus King, who joined Gilday on the tour, said shipyard managers and production workers are now on the same page.</p>



<p class="wp-block-paragraph">Collins said she witnessed “an unprecedented cooperation” and King said there was “a new spirit of cooperation.” </p>



<p class="wp-block-paragraph">“I’ve seen a mood here in the last several visits that’s unlike any other I’ve experienced since I’ve been here,” King said. “They’re all focused on one goal, which is meeting schedule and meeting budget,” he added.</p>



<p class="wp-block-paragraph">The strike by production workers represented by Machinists Union Local S6 happened in the middle of the pandemic. The shipyard said it wanted more flexibility to get caught up on a backlog of work while workers didn’t want to give up ground to subcontractors.</p>



<p class="wp-block-paragraph">The shipyard builds destroyers, the workhorse of the Navy fleet. The ships have the ability to provide air defense while simultaneously waging war against submarines and surface warships.</p>



<p class="wp-block-paragraph">The shipyard has hired nearly 3,000 workers since 2019 as part of its effort to speed up production and meet the Navy’s timetable for delivering ships, said shipyard spokesperson David Hench.</p>



<p class="wp-block-paragraph">The workforce now tops 7,000, and the company is hiring 2,000 more workers this year, he said.</p>
]]></content:encoded>
	</item>
		<item>
		<title>Shipbuilders approve 3-year pact, ending monthslong strike at Bath Iron Works</title>
		<link>https://www.defensenews.com/industry/2020/08/23/shipbuilders-approve-3-year-pact-ending-monthslong-strike-at-bath-iron-works/</link>
					<comments>https://www.defensenews.com/industry/2020/08/23/shipbuilders-approve-3-year-pact-ending-monthslong-strike-at-bath-iron-works/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Sun, 23 Aug 2020 20:23:17 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2020/08/23/shipbuilders-approve-3-year-pact-ending-monthslong-strike-at-bath-iron-works/</guid>

					<description><![CDATA[A 63-day strike at Bath Iron Works — against the backdrop of a pandemic in an election year — came to an end Sunday with shipbuilders voting to return to their jobs producing warships for the United States Navy.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/2020/08/23/shipbuilders-approve-3-year-pact-ending-monthslong-strike-at-bath-iron-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">25848</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP20236528109522.jpg.jpg" width="2000" height="1333" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP20236528109522.jpg.jpg" width="2000" height="1333" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — A 63-day strike at Bath Iron Works — against the backdrop of a pandemic in an election year — came to an end Sunday with shipbuilders voting to return to their jobs producing warships for the United States Navy.</p>



<p class="wp-block-paragraph">With the approval of a three-year contract, the 4,300 production workers represented by Machinists Local S6 will begin returning to work on Monday. </p>



<p class="wp-block-paragraph">After falling behind schedule, Bath Iron Works is eager to get caught up on production of destroyers as the U.S. Navy faces growing competition from China and Russia on the high seas. The General Dynamics subsidiary was already behind more than six months schedule before the strike. </p>



<p class="wp-block-paragraph">“We are pleased to welcome back our valued manufacturing employees and get back to the important work of building ships on schedule for the U.S. Navy,” Bath Iron Works said Sunday in a statement. </p>


	<aside class="smg-interstitial-link wp-block-smg-interstitial-link">
		<a href="https://www.defensenews.com/industry/2020/06/22/production-workers-strike-against-major-us-navy-shipbuilder/" class="smg-interstitial-link__inner">
							<div class="smg-interstitial-link__media">
					<img loading="lazy" decoding="async" width="300" height="200" src="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP20174394634937.jpg.jpg?w=300" class="smg-interstitial-link__image wp-post-image" alt="" />				</div>
						<div class="smg-interstitial-link__content">
				<span class="smg-interstitial-link__kicker">Related</span>
				<h3 class="smg-interstitial-link__title">Production workers strike against major US Navy shipbuilder</h3>
									<p class="smg-interstitial-link__excerpt">More than 4,000 workers went on strike against one of the U.S. Navy’s largest shipbuilders on June 22.</p>
							</div>
		</a>
	</aside>
	


<p class="wp-block-paragraph">Robert Martinez Jr., the Machinists’ international president, cast the outcome on Sunday in historic terms, saying “this fight for dignity, justice and good Maine jobs will go down in the history books of the Machinists Union.”  </p>



<p class="wp-block-paragraph">The shipyard on the Kennebec River is one of the Navy’s largest, and it’s also a major employer in the state with with 6,800 workers. </p>



<p class="wp-block-paragraph">The stakes were high for both a company that feared being priced out of competition for Navy contracts and a highly skilled workforce that didn’t want to give up ground to subcontractors. The test of wills ultimately ended with help from a federal mediator. </p>



<p class="wp-block-paragraph">Shipbuilders represented by Machinists Local S6 got most of what they wanted when it came to work rules and maintaining the status quo for hiring of subcontractors, along with the previous proposal’s annual pay raises of 3% for three years. The company got streamlined rules for hiring subcontracting, and a commitment to work together to get back on track. </p>



<p class="wp-block-paragraph">Because of the pandemic, voting on the contract’s approval — unanimously endorsed by the union negotiating committee — took place online and by telephone. Voting began Friday  and ending at noon Sunday. The vote was 87% in favor of the contract among those who voted, said Jay Waldeigh, a district union official. </p>



<p class="wp-block-paragraph">“Now that we successfully protected our contract language with respect to subcontracting and seniority, we need to get back to work,” said Local S6 President Chris Wiers. </p>



<p class="wp-block-paragraph">The shipyard builds the workhorse of the Navy fleet, destroyers that have the ability to provide air defense while simultaneously waging war against submarines and surface warships. Destroyers are also one of the few types of warships equipped to withstand a chemical attack. </p>



<p class="wp-block-paragraph">The Navy wants to increase the fleet’s size — something President Donald Trump supports — and Bath Iron Works has said it needs to get back on schedule and lower costs to remain competitive on those contracts. </p>



<p class="wp-block-paragraph">Going into negotiations, the shipyard’s production workers were already angry over past concessions that ultimately still failed to yield contracts on Coast Guard cutters and a new class of Navy frigates. The pandemic in which they were required to remain on the job only added to their feeling that the company didn’t care about them — deemed essential by the Navy, the shipyard continued production despite a union request to shut down for two weeks. </p>



<p class="wp-block-paragraph">Workers were determined enough to strike, despite the loss of company-paid insurance as the coronavirus raged around the country. A giant inflatable, cigar-smoking pig outside the union hall took aim at corporate greed as workers fumed over the hiring of “scab” workers and political leaders got involved. </p>



<p class="wp-block-paragraph">It’s a far cry from the way things were in the past. </p>



<p class="wp-block-paragraph">The strike was the first in 20 years at Bath Iron Works. There was enough trust between management and the union in 1994 that a contract was approved allowing cross-training of workers under a formula called a “High Performance Work Organization.” Then-President Bill Clinton visited the shipyard to praise the collaboration. </p>



<p class="wp-block-paragraph">The company hopes that mediated discussions between the union and the company will help get the relationship back on track. </p>



<p class="wp-block-paragraph">But it’s going to take time. Levi Benner, a shipfitter, said there are hard feelings because management routinely rejects workers’ ideas for improvements. </p>



<p class="wp-block-paragraph">“It’s going to be hard to restore trust. We know what we’re doing. We’ve been building ships for years and years. These guys are geeks. They know their graphs and pie charts, but they don’t know how to build ships,” he said Sunday. </p>



<p class="wp-block-paragraph">In the end, workers and the shipyard must learn how to work together if the company is to successfully compete for contracts against lower-cost competitors, said Loren Thompson, an analyst at the Lexington Institute. </p>



<p class="wp-block-paragraph">“Both sides need to understand that their best chance for having a future is to get along with each other,” he said. “The American landscape is littered with the debris of destroyed industries. Most of them made a good product but they’re still gone.”  </p>



<p class="wp-block-paragraph"><i>This story has been corrected to show that the giant inflatable animal outside the union hall was a pig, not a rat.</i></p>
]]></content:encoded>
	</item>
		<item>
		<title>Production workers strike against major US Navy shipbuilder</title>
		<link>https://www.defensenews.com/industry/2020/06/22/production-workers-strike-against-major-us-navy-shipbuilder/</link>
					<comments>https://www.defensenews.com/industry/2020/06/22/production-workers-strike-against-major-us-navy-shipbuilder/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Mon, 22 Jun 2020 13:19:55 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Global]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<category><![CDATA[The Americas]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2020/06/22/production-workers-strike-against-major-us-navy-shipbuilder/</guid>

					<description><![CDATA[More than 4,000 workers went on strike against one of the U.S. Navy’s largest shipbuilders on June 22.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/2020/06/22/production-workers-strike-against-major-us-navy-shipbuilder/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">55600</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP20174394634937.jpg.jpg" width="5334" height="3556" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/AP20174394634937.jpg.jpg" width="5334" height="3556" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — More than 4,000 workers went on strike against one of the U.S. Navy’s largest shipbuilders Monday after rejecting a three-year contract. It was the first strike by production workers at Bath Iron Works in 20 years.</p>



<p class="wp-block-paragraph">Pickets formed at midnight when the old contract expired in a dispute that focused on subcontracting, work rules. and seniority over wages and benefits.</p>



<p class="wp-block-paragraph">Bath Iron Works already had fallen six months behind on ship construction, partly due to the coronavirus pandemic, and the strike threatened to further delay production of destroyers for the Navy, the company said.</p>



<p class="wp-block-paragraph">The three-year contract proposal would have given production workers a 3 percent raise each year. But the shipbuilders’ union objected to more than a dozen changes that it considered to be concessions — including hiring subcontractors.</p>



<p class="wp-block-paragraph">Machinists Union Local S6, which represents 4,300 workers, <a href="https://www.defensenews.com/industry/2020/06/18/bath-iron-works-shipbuilders-are-on-the-verge-of-striking/" target=_blank>voted 87 percent</a> in favor of a strike. The tally was announced on Sunday.</p>



<p class="wp-block-paragraph">“This should send a crystal clear message to BIW management: Respect your workers, go back to the bargaining table and negotiate a fair contract,” Maine AFL-CIO President Cynthia Phinney said in a statement.</p>



<p class="wp-block-paragraph">Frustration had been building among workers since the last contract in which the Machinists union accepted concessions that were deemed necessary to win a U.S. Coast Guard contract — and save shipbuilding jobs.</p>



<p class="wp-block-paragraph">Bath Iron Works lost that contract to another shipyard in 2016. It also lost a competition for Navy frigates in late April.</p>



<p class="wp-block-paragraph">Shipbuilders contend the problems have been caused by mismanagement. The company contends the shipyard must be more efficient and get back on schedule to successfully compete for work.</p>



<p class="wp-block-paragraph">Competition is becoming fierce. Bath Iron Works, a subsidiary of General Dynamics, competes against Mississippi’s Ingalls Shipbuilding for construction of technologically sophisticated destroyers. But smaller shipyards in Alabama and Wisconsin are also competing for work on smaller warships.</p>



<p class="wp-block-paragraph">The issue at Bath Iron Works is how much the shipyard can absorb and remain competitive, said Loren Thompson, an analyst at the Lexington Institute.</p>



<p class="wp-block-paragraph">“Management is afraid that they’re going to price themselves out of the market,” he said.</p>



<p class="wp-block-paragraph">The shipyard on the Kennebec River is one of the Navy’s five largest shipbuilders and a major employer in Maine, with 6,800 workers.</p>



<p class="wp-block-paragraph">Bath Iron Works contends changes in the contract are aimed at making more efficient use of workers and streamlining the hiring of subcontractors.</p>



<p class="wp-block-paragraph">The shipyard hired 1,800 workers last year and expects to hire 1,000 workers this year, but subcontractors are still needed for the shipyard to get caught up on the construction schedule, company president Dirk Lesko has said.</p>



<p class="wp-block-paragraph">The pandemic made existing tensions worse. The union called for a two-week closure of the shipyard, and lawmakers jumped into the fray, urging the shipyard to do more to protect workers.</p>



<p class="wp-block-paragraph">The federal government classified the shipyard as essential, and production — using stringent protocols for disinfecting and distancing — never ceased.</p>



<p class="wp-block-paragraph">Three workers tested positive for the coronavirus but all of them have since returned to work, the shipyard said.</p>
]]></content:encoded>
	</item>
		<item>
		<title>Bath Iron Works shipbuilders are on the verge of striking</title>
		<link>https://www.defensenews.com/industry/2020/06/18/bath-iron-works-shipbuilders-are-on-the-verge-of-striking/</link>
					<comments>https://www.defensenews.com/industry/2020/06/18/bath-iron-works-shipbuilders-are-on-the-verge-of-striking/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Thu, 18 Jun 2020 19:17:25 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Global]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<category><![CDATA[The Americas]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2020/06/18/bath-iron-works-shipbuilders-are-on-the-verge-of-striking/</guid>

					<description><![CDATA[The largest union at U.S. Navy shipbuilder Bath Iron Works begins voting Friday on a contract proposal that was unanimously rejected by its negotiating committee, raising the possibility of the first strike in 20 years.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/2020/06/18/bath-iron-works-shipbuilders-are-on-the-verge-of-striking/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">23464</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/ap17004853998404.jpg.jpg" width="2000" height="1410" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/ap17004853998404.jpg.jpg" width="2000" height="1410" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — The largest union at U.S. Navy shipbuilder Bath Iron Works begins voting Friday on a contract proposal that was unanimously rejected by its negotiating committee, raising the possibility of the first strike in 20 years.</p>



<p class="wp-block-paragraph">Shipbuilders from Machinists Union Local S6 would see a 9 percent pay raise over three years under the proposal, but they’re digging in over what they view as concessions on subcontracting, work rules and seniority.</p>



<p class="wp-block-paragraph">Workers are disgruntled after they said they made concessions in the last contract to win a lucrative Coast Guard contract. Another contractor was awarded that contract.</p>



<p class="wp-block-paragraph">The union’s negotiating committee issued a statement Thursday calling the contract offer “garbage” and accusing the company president of “deceitful, dishonest, despicable, unprofessional and relentless” efforts to destroy the union. The president contends the company negotiated in good faith.</p>



<p class="wp-block-paragraph">A strike is a “distinct possibility” as about 4,300 workers prepare to cast their votes, said Jay Wadleigh, a district business representative for the Machinists Union.</p>



<p class="wp-block-paragraph">“We seem to be headed in that direction,” he said.</p>



<p class="wp-block-paragraph">The last strike at the shipyard, in 2000, lasted 55 days.</p>



<p class="wp-block-paragraph">The company’s three-year proposal would give shipbuilders a 3 percent raise during each year. But the union’s major issue isn’t with wages, pensions or benefits. Instead, there are more than a dozen changes that the union considers to be concessions. Among them, the company wants to use subcontractors to catch up after falling six months behind on work.</p>



<p class="wp-block-paragraph">The union considers a separate proposal to change preferences for shift and location for work assignments to be an attack on seniority that potentially allows workers to be singled out for abuse.</p>



<p class="wp-block-paragraph">The company doesn’t view the contract as concessionary or an attack on the union. The aim is to streamline the process of hiring subcontractors who are needed despite the hiring of 1,800 workers last year and another 1,000 workers this year, said Dirk Lesko, the shipyard’s president.</p>



<p class="wp-block-paragraph">“We’re not trying to subcontract jobs,” he said. “We’re trying to grow the workforce. But we have more work at the moment than we can get done because <a href="https://www.defensenews.com/coronavirus/2020/03/16/with-coronavirus-on-the-loose-us-shipyards-make-adjustments-but-keep-building/" target=_blank>we’re behind</a>. We don’t want to fall further behind. We don’t want to do anything to slow down the hiring.”</p>



<p class="wp-block-paragraph">The goal of rules for shifting of workers between assignments is to keep them busy to avoid layoffs during the inevitable lulls for specific skills during construction, he said.</p>



<p class="wp-block-paragraph">Because of the coronavirus, shipbuilders will cast their votes online or by phone. The voting is due to wrap up Sunday at noon, ahead of the contract expiration at midnight.</p>



<p class="wp-block-paragraph">Workers will be voting on whether to accept the contract and whether to strike. It would take a two-thirds vote to trigger a strike.</p>



<p class="wp-block-paragraph">The last contract vote, in late 2015, took place amid dire warnings that as many as 1,200 jobs could be lost if the shipyard failed to win a Coast Guard contract. Another shipyard ultimately won that contract, but Bath Iron Works eventually secured additional Navy contracts.</p>



<p class="wp-block-paragraph">If anything, the shipbuilding landscape has been even more challenging since then. Bath Iron Works is one of the Navy’s five largest shipbuilders, but the Navy has been awarding more contracts for smaller vessels to other shipyards in Alabama and Wisconsin.</p>



<p class="wp-block-paragraph">Marinette Marine, in Wisconsin, recently beat out Bath Iron Works for a lucrative contract to build a new line of frigates.</p>



<p class="wp-block-paragraph">Looking ahead, the Defense Department is considering additional <a href="https://www.defensenews.com/naval/2020/06/01/us-navy-embraces-robot-ships-but-some-unresolved-issues-are-holding-them-back/" target=_blank>smaller ships and unmanned ships</a>, and the smaller shipyards will likely compete for those, said Matt Caris, naval analyst for Avascent.</p>



<p class="wp-block-paragraph">“The base of current business is changing even as the competitive landscape is growing or shifting. It puts Bath in a tough spot,” he said.</p>



<p class="wp-block-paragraph">The pandemic has added to worker angst.</p>



<p class="wp-block-paragraph">Many lawmakers threw their support behind workers by calling for the Navy and shipyard to institute greater protections as the union asked for the shipyard to shut down for two weeks. The federal government classified the shipyard as essential and production never ceased.</p>



<p class="wp-block-paragraph">The shipyard continued operations through the pandemic using stringent protocols for disinfecting and distancing. Three workers were sickened by the virus, but all returned to work.</p>
]]></content:encoded>
	</item>
		<item>
		<title>Shipbuilders replace stealthy US destroyer’s 15-ton turbine</title>
		<link>https://www.defensenews.com/industry/2018/08/31/shipbuilders-replace-stealthy-us-destroyers-15-ton-turbine/</link>
					<comments>https://www.defensenews.com/industry/2018/08/31/shipbuilders-replace-stealthy-us-destroyers-15-ton-turbine/#respond</comments>
		
		<dc:creator><![CDATA[David Sharp, The Associated Press]]></dc:creator>
		<pubDate>Fri, 31 Aug 2018 14:04:47 +0000</pubDate>
				<category><![CDATA[Daily News Roundup]]></category>
		<category><![CDATA[Industry]]></category>
		<category><![CDATA[Naval]]></category>
		<category><![CDATA[Newsletters]]></category>
		<guid isPermaLink="false">https://one.sightlinemg.com/defensenews/uncategorized/2018/08/31/shipbuilders-replace-stealthy-us-destroyers-15-ton-turbine/</guid>

					<description><![CDATA[The delicate operation involved lifting and maneuvering the 15-ton Rolls-Royce marine turbine out of the ship.]]></description>
		
					<wfw:commentRss>https://www.defensenews.com/industry/2018/08/31/shipbuilders-replace-stealthy-us-destroyers-15-ton-turbine/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">44407</post-id><media:thumbnail url="https://one.sightlinemg.com/wp-content/uploads/2026/08/636018574370349865-ap-16170642591194jpg.jpg" width="3000" height="1942" type="image/jpeg" />
<media:content medium="image" url="https://one.sightlinemg.com/wp-content/uploads/2026/08/636018574370349865-ap-16170642591194jpg.jpg" width="3000" height="1942" type="image/jpeg" />
<news:push>0</news:push>
<content:encoded><![CDATA[
<p class="wp-block-paragraph">BATH, Maine — Shipbuilder Bath Iron Works has replaced one of the massive turbines on the future USS Michael Monsoor, and the stealthy destroyer is scheduled to depart for San Diego in November.</p>



<p class="wp-block-paragraph">The delicate operation involved lifting and maneuvering the 15-ton Rolls-Royce marine turbine out of the ship, and workers had to build a rail system to assist in the removal and installation of the replacement turbine in August, officials said.</p>



<p class="wp-block-paragraph">“The number of twists and turns it had to go through represented a pretty interesting engineering evolution,” shipyard President Dirk Lesko said.</p>



<p class="wp-block-paragraph">Shipbuilders noticed an unusual vibration during sea trials and discovered afterward that a foreign object had damaged some of the blades, Lesko said. Although the turbine still worked, the Navy decided to replace it rather than repair the unit.</p>



<p class="wp-block-paragraph">The Zumwalt-class destroyers use two main turbines similar to ones used on Boeing 777 jetliners to produce electricity that powers the ship and its sophisticated systems. Combined with auxiliary turbines, the ship produces 78 megawatts of power, enough for a small- to medium-size city.</p>



<p class="wp-block-paragraph">The Zumwalt and Monsoor are the first and second in a class of three of the stealthy destroyers. The third, the Lyndon B. Johnson, remains under construction.</p>



<p class="wp-block-paragraph">The Monsoor repairs presented an inconvenience because the Navy crew is already aboard the ship, and the repairs interrupted some of their training, Lesko said.</p>



<p class="wp-block-paragraph">&#8220;We tried to work around them in a way that would be minimally impactful,&#8221; he said. &#8220;We were both satisfied with how that turned out.&#8221;</p>



<p class="wp-block-paragraph">The destroyer, named for a Navy SEAL who threw himself on a grenade to save comrades, is due to be commissioned in January in Coronado, California.</p>



<p class="wp-block-paragraph">The ships with an unusual, stealthy shape are the largest and costliest destroyers built for the Navy, weighing in at 15,000 tons.</p>



<p class="wp-block-paragraph">They feature an unconventional wave-piercing hull and a sleek deckhouse that hides radar and other sensors inside. Heavy automation allowed the Navy to reduce the crew size by half, compared with the other destroyers in the fleet.</p>
]]></content:encoded>
	</item>
	</channel>
</rss>
